San Jose has delayed the effective date of its mandatory soft-story retrofit ordinance to April 1, 2027. That gives owners more time, but it does not make the issue disappear. Owners of older apartment buildings can use the extra months to find out whether a property is covered, gather records, and explore limited financial help before demand for engineers and contractors increases.
What Counts as a Soft-Story Building in San Jose
The ordinance focuses on older multifamily buildings with a weaker wood-frame level. A common example is an apartment building with parking, storage, or wide openings on the ground floor and housing above. That open level may not resist side-to-side earthquake forces as well as the stories above it.
The City of San Jose’s program page says a subject building generally was constructed or permitted before January 1, 1990, has at least two stories and three dwelling units, and contains a wood-frame target story. A building that receives a city screening notice is also treated as subject to review until it is found exempt.
Ownership type does not decide the question by itself. The city’s definition can include rented or owner-occupied residential units, townhouses, and certain hotel or motel rooms. A single-family house or duplex follows a different retrofit process.
Why the Effective Date Moved to April 1, 2027
San Jose approved the ordinance in September 2024, then delayed implementation while financing and administration were being developed. The current city page says the mandatory program is scheduled to take effect on April 1, 2027.
The delay matters because a retrofit can require screening, engineering, permits, tenant coordination, and construction financing. It also means older articles may show dates that are no longer current. Owners should rely on the city’s latest notice for the property instead of assuming an earlier schedule still controls.
City background material estimates that vulnerable soft-story buildings account for roughly 8,000 housing units. The local purpose is both public safety and housing preservation: a building that remains usable after an earthquake protects residents and reduces displacement.
How Owners Can Screen a Building Now
The city has an online screening form through SJPermits.org. An owner first creates an account and then submits the soft-story screening information. Screening is the practical first step because it determines whether the building fits the ordinance rather than forcing the owner to judge the structure from appearance alone.
Useful records may include the original construction year, building permits, prior retrofit plans, unit count, assessor information, and photographs of the lower level. A licensed design professional may still be needed to evaluate the framing and prepare plans.
Owners should also check whether earlier work was permitted and closed out. A remodeled garage, storefront, or parking level may affect the review. Our report on San Jose condominium and leasing issues shows why building records and unresolved project questions can matter when a property is financed or sold.
Funding May Be Easier to Pursue Before the Deadline
The city says two assistance paths are available for buildings that qualify: a San Jose pilot loan-and-grant program and the California Residential Mitigation Program’s Earthquake Multi-Unit Retrofit grant. Funding is limited and eligibility comes before an award.
That is why the city encourages owners interested in aid to complete screening early, even though no action is required before the ordinance’s effective date. An early determination can make it easier to compare financing, obtain professional estimates, and plan around leases or major maintenance.
A grant or loan announcement is not a promise that every owner will receive money. Confirm current funding, eligible costs, owner contributions, and repayment terms in writing before signing a construction contract.
Build a Property File Before Design and Construction
Keep the city’s notice, screening result, ownership documents, permit history, plans, inspection records, bids, financing papers, and tenant communications together. Note which deadlines apply to the building’s group, because the city separates subject buildings by age and number of units. Confirm the current schedule directly with the program before relying on a date found in an older memo.
Property Records of California offers property history reports and related ownership and transaction information that may help an owner assemble background facts. The guide to ordering a property history report explains the type of material available. That research does not replace San Jose’s screening decision, a structural evaluation, or the official permit file.
The best use of the delay is preparation. Identify the building, submit the screening, preserve the paper trail, and speak with qualified professionals before the April 2027 effective date turns a planning task into a deadline problem.